Castlewood Care Home

Castlewood Care Home

Edmonton, Alberta

PROJECT SUMMARY:
End Use: Seniors Housing
Size: 6,509 sq. ft.

Project Delivery Method:
Design | Build                                              Consultant: Brian Allsopp Architect
Completion: October, 2016

PROJECT SUMMARY
End Use: Offices
Size: 6,580 sq. ft. 

Project Delivery Method:
Construction Management
Consultant: Savill Group Architecture Ltd.
Completed: June, 2016

Sunshine Villa

Sunshine Villa

Tofield, Alberta

PROJECT SUMMARY:
End Use: Seniors Housing
Size: 42,000 sq. ft.

Project Delivery Method:
Design | Build                                              Consultant: Cognidyn Engineering
Completion: May, 2011
NOTES: Three storey, wood-framed structure is comprised of 48 suites. The building has been designed to accommodate two additional three-storey wings in the future.

PROJECT SUMMARY
End Use: Offices
Size: 6,580 sq. ft. 

Project Delivery Method:
Construction Management
Consultant: Savill Group Architecture Ltd.
Completed: June, 2016

Parkland Lodge

Parkland Lodge

Edson, Alberta

PROJECT SUMMARY:
End Use: Seniors Housing
Size: 105,400 sq. ft. 
Site: 5 acres

Project Delivery Method:
Stipulated Price                                              Consultant: Berry Architecture + Associates
Completion: January, 2020
NOTES: Project details included the demolition of one existing building plus renovations to another. The new construction is a three-storey, wood-framed addition housing 105 suites. This project was completed with a high degree of collaboration with the Client and is the first of two projects SBI is constructing with them.

PROJECT SUMMARY
End Use: Offices
Size: 6,580 sq. ft. 

Project Delivery Method:
Construction Management
Consultant: Savill Group Architecture Ltd.
Completed: June, 2016

Alberta Highway Services Ltd.

Alberta Highway Services Ltd.

Calgary, Alberta

PROJECT SUMMARY:
End Use: Transportation
Size: 30,074 sq. ft.
Site: 13 acres

Project Delivery Method:
Design | Build
Consultant: The Tarjan Group
Completed: October, 2020
Maintenance Shop & Wash Bay: 16,296 sq. ft.
Salt Shed constructed with a Butler Building: 13,778 sq. ft.

Purolator

Purolator

Red Deer, Alberta

PROJECT SUMMARY:
End Use: Transportation
Size: 30,002 sq. ft.
Site: 4.14 acres

Project Delivery Method:
Design | Build  Fixed Price
Consultant: Cognidyn Engineering & Design
Completed: May, 2020

Mustang

Mustang

Acheson, Alberta

PROJECT SUMMARY
End Use: Office/Cross Dock
Size: 18,595 sq. ft.
Site: 5.8 acres

Project Delivery Method:
Design | Build
Consultant: T.I. Studios Architecture Inc.
Completed: February, 2020

Trail Appliances Crowfoot

Trail Appliances Crowfoot

Calgary, Alberta

PROJECT SUMMARY
End Use: Renovation
Size: 27,200 sq. ft.

Project Delivery Method:
Design | Build  Cost Plus
Consultant: The Tarjan Group
Completed: September, 2019
Notes: A full interior and exterior renovation, this project required a full interior demolition as well to facilitate a structural modification. New glass, spandrel panel and alucabond panels were added to the exterior while the interior’s full reno created an open concept to showcase products. All sidewalks, curbing and the parking lot were also redone.

Buy Low Grocery Store

Buy Low Grocery Store

Blackfalds, Alberta

PROJECT SUMMARY
End Use: Grocery Store
Size: 35,393 sq. ft.
Site: 6.4 acres

Project Delivery Method:
Design | Build
Consultant: BCW Architects
Completed: December, 2019
Notes: This is one of three projects Scott Builders is working on with Buy-Low.

The Shops of Trader Ridge Phase 1

The Shops of Trader Ridge Phase 1

Grande Prairie, Alberta

PROJECT SUMMARY:
End Use:  Retail
Size: 30,816 sq. ft.
Site: 4.9 acres

Project Delivery Method:
Construction Management
Consultant: DIALOG
Completed: April, 2020
Notes: Three building consisting of 21 lease bays plus a stand-alone building for Popeyes Louisiana Kitchen.

Blackfalds Crossing

Blackfalds Crossing

Blackfalds, Alberta

PROJECT SUMMARY:
End Use:  Retail
Size: 35,393 sq. ft.
Site: 6.4 acres

Project Delivery Method:
Design | Build
Consultant: BCW Architects
Completed: December, 2019
Notes: Two tenant lease bays buildings were constructed. Scott Builders completed the Tenant Improvement for Buy Low Grocery Store, but other tenants include Dollarama and Buster’s Pizza.