High River Fire Hall Addition
High River, Alberta
PROJECT SUMMARY
End Use: Fire Hall
Size: 8,411 sq. ft. Addition
Project Delivery Method:
Fixed Price Contract
Consultant: S2 Architecture
Completed: August 2021
High River, Alberta
PROJECT SUMMARY
End Use: Fire Hall
Size: 8,411 sq. ft. Addition
Project Delivery Method:
Fixed Price Contract
Consultant: S2 Architecture
Completed: August 2021
New Sarepta, Alberta
PROJECT SUMMARY
End Use: Fire Hall
Size: 16,330 sq. ft.
Project Delivery Method:
Design | Build
Consultant: Stantec
Completed: May 2021
Calgary, Alberta
PROJECT SUMMARY
End Use: Medical Clinic
Size:
Existing Building Renovation:
9,042 sq. ft.
Two Storey Addition: 5,436 sq. ft.
Project Delivery Method:
CCDC #2 Stipulated Price Contract
Consultant: Nyhoff Architecture
Completed: June 2019
Provost, Alberta
PROJECT SUMMARY
End Use: Medical Clinic
Size: 16,318 sq. ft.
Site: 1 acres
Project Delivery Method:
CCDC #14 Design | Build
Design Build Team: Provost Medical Clinic, Scott Builders, BCW Architects
Completed: April 2021
Notes:
Construction of a new 2 storey facility.
Installation of a precast basement and structural steel 2 storey shell.
The basement consists of future lease space, meeting areas as well as washroom facilities.
The main floor is developed as a full serve doctors office with staff offices, exam rooms, lunchroom and washroom facilities.
The second floor is divided into Primary care network space as well as a fully functioning dental clinic.
Edmonton, Alberta
PROJECT SUMMARY
End Use: Retail
Size: 15,597 sq. ft. renovation
Project Delivery Method:
CCDC #14 Design | Build Contract
Design Build Team: Lake House Marine, Scott Builders, Laviolette Engineering Ltd.
Completed: July 2021
Notes:
This facility was renovated to showcase boats and accessories for marine living.
A special coating was applied to the interior floors to replicate a lake and beach setting.
Balzac, Alberta
PROJECT SUMMARY
End Use: Office/Warehouse
Size: 65,000 sq. ft.
Site: 3 acres
Project Delivery Method:
CCDC #2 Stipulated Price Contract
Consultant: T.I. Studios Architecture Inc.
Completed: March 2021
Notes:
This facility includes a sub-zero (-200C) freezer and loading bay with 11 loading docks.
Structurally, this facility has a piles and grade beam foundation, insulated slab-on-grade with hydronic heating subbase, steel structure with insulated metal panels on the exterior walls.
Innisfail, Alberta
PROJECT SUMMARY:
Crossroads has been part of the Natural Gas Distribution and marketing industry since 1973 and has grown from 1300 services that year to 3300 in 2020. Working with Scott’s in house design team, Crossroads chose a Butler Engineered building system for their 20,647 sq. ft facility incorporating Butler roof and wall systems, along with conventional materials into the design. Space is split evenly between Administrative Offices and Shop. Form of contract was Design-Build with Scott assuming full responsibility for both Design and Construction.
Project Delivery Method:
Design | Build
Design Build Team: Crossroads Gas Co-op, Scott Builders
Edmonton, Alberta
PROJECT SUMMARY:
End Use: Seniors Housing
Size: 6,509 sq. ft.
Project Delivery Method:
Design | Build Consultant: Brian Allsopp Architect
Completion: October, 2016
PROJECT SUMMARY
End Use: Offices
Size: 6,580 sq. ft.
Project Delivery Method:
Construction Management
Consultant: Savill Group Architecture Ltd.
Completed: June, 2016
Tofield, Alberta
PROJECT SUMMARY:
End Use: Seniors Housing
Size: 42,000 sq. ft.
Project Delivery Method:
Design | Build Consultant: Cognidyn Engineering
Completion: May, 2011
NOTES: Three storey, wood-framed structure is comprised of 48 suites. The building has been designed to accommodate two additional three-storey wings in the future.
PROJECT SUMMARY
End Use: Offices
Size: 6,580 sq. ft.
Project Delivery Method:
Construction Management
Consultant: Savill Group Architecture Ltd.
Completed: June, 2016
Edson, Alberta
PROJECT SUMMARY:
End Use: Seniors Housing
Size: 105,400 sq. ft.
Site: 5 acres
Project Delivery Method:
Stipulated Price Consultant: Berry Architecture + Associates
Completion: January, 2020
NOTES: Project details included the demolition of one existing building plus renovations to another. The new construction is a three-storey, wood-framed addition housing 105 suites. This project was completed with a high degree of collaboration with the Client and is the first of two projects SBI is constructing with them.
PROJECT SUMMARY
End Use: Offices
Size: 6,580 sq. ft.
Project Delivery Method:
Construction Management
Consultant: Savill Group Architecture Ltd.
Completed: June, 2016