PROJECT SUMMARY
Size: 30,074 sq. ft. on 13 acres
Building Delivery Method: Design-Build
Design Team: Alberta Highway Services, Scott Builders Inc. and The Tarjan Group
Consisting of two Butler Engineered structures, this project was completed in 2021 by Scott. One facility, the salt shed, is used by the AHS crew to mix sand and salt to serve Calgary’s Ring Road.
Drop us a line and we will return your message as soon as possible