Crossroads Gas Co-op

Crossroads Gas Co-op

Innisfail, Alberta

PROJECT SUMMARY:
Crossroads has been part of the Natural Gas Distribution and marketing industry since 1973 and has grown from 1300 services that year to 3300 in 2020. Working with Scott’s in house design team, Crossroads chose a Butler Engineered building system for their 20,647 sq. ft facility incorporating Butler roof and wall systems, along with conventional materials into the design. Space is split evenly between Administrative Offices and Shop. Form of contract was Design-Build with Scott assuming full responsibility for both Design and Construction.

Project Delivery Method:
Design | Build
Design Build Team: Crossroads Gas Co-op, Scott Builders

Cross Country Pipeline Office, Warehouse & Shop

Cross Country Pipeline Office, Warehouse & Shop

Spruce Grove, Alberta

PROJECT SUMMARY
End Use: Office/Warehouse
Size: 33,770 sq. ft.
Size: 11.5 acres

Project Delivery Method:
CCDC #14 Design | Build
Design Build Team: Cross Country Pipeline, Scott Builders, Laviolette Engineering Ltd.
Completed: February 2020

CSM Pumps Shop & Office

CSM Pumps Shop & Office

Nisku, Alberta

PROJECT SUMMARY
End Use:
Office/Manufacturing
Size: 
38,717 sq. ft.
Main Floor: 31,301 sq. ft.
Mezzanine: 2,841 sq. ft.
2nd Floor Office: 4,575 sq. ft.
Site: 0.8 acres

Project Delivery Method:
CCDC #14 Design | Build  Cost Plus
Design Build Team: CSM Pumps, Scott Builders, Mazurik Architecture
Completed: November 2019

Ste. Anne Natural Gas

Ste. Anne Natural Gas

Lac Ste. Anne, Alberta

PROJECT SUMMARY:
Ste Anne Natural Gas Cooperative (SANG COOP LTD.) is the largest rural Gas distribution system in Alberta with service to over 6700 Members and maintaining over 4500 kilometres of gas pipeline. As in the case of Crossroads, SANG chose a Butler Engineered Building System with maintenance free roof and walls and providing an interior column free space for both the shop and administration areas of  17,400 square feet. SANG utilized Scott’s in-house Design Service. Building Delivery Method was Design-Build.

Project Delivery Method:
Design | Build
Design Build Team: Ste. Anne Natural Gas, Scott Builders, Walters Chambers & Associates

AltaLink Janet Service Centre

AltaLink Janet Service Centre

Calgary, Alberta

PROJECT SUMMARY
AltaLink is one of Canada’s largest electricity transmission Companies and is responsible for the maintenance and operation of approximately 1200 kilometres of transmission lines and 208 substations in Alberta. Their new AltaLink Janet Service Centre, at 74,465 sq. ft., was designed and built to service huge utility transformers in their high voltage Servicing Bay, requiring in this area alone, two 80 Ton Cranes operating from inside to outside through a 30’ x 30’ door opening. Other challenges for the Design-Build team included the provision of fire protection from a 2.0 acre retention pond and pump house on the site, with site services to be accommodated on site via underground cisterns. The Team, comprised of AltaLink, their Project Manager, Scott as the Design-Build Contractor and BCW Architects, collaborated very well to produce a well designed, functional and attractive facility.

Project Delivery Method:
Design | Build
Design Build Team: AltaLink Janet Service Centre, Scott Builders, BCW Architects

ATCO Gas Operations Centre

ATCO Gas Operations Centre

Red Deer, Alberta

PROJECT SUMMARY
Built on 6.3 acres of land in Red Deer’s Edgar Industrial Park, this 35,000 sq. ft. facility was designed in a T shape with the bottom leg housing a wash bay, stores, shop/maintenance space, emergency vehicle storage space, pipe threading and fustion rooms as well as related office and staff areas. The top of the T houses the administration of the three main field groups including private offices and bull pen areas, meeting and training rooms, and conference room. This was a Design-Build project and Atco had their Key Department Heads participate directly with Scott design staff…as a team, during the entire design phase resulting in an exceptionally functional and attractive facility.



Project Delivery Method:
Design | Build
Design Build Team: ATCO Gas Operations Centre, Scott Builders, Bearden Engineering Consultants Ltd.