Crossroads Gas Co-op

Crossroads Gas Co-op

Innisfail, Alberta

PROJECT SUMMARY:
Crossroads has been part of the Natural Gas Distribution and marketing industry since 1973 and has grown from 1300 services that year to 3300 in 2020. Working with Scott’s in house design team, Crossroads chose a Butler Engineered building system for their 20,647 sq. ft facility incorporating Butler roof and wall systems, along with conventional materials into the design. Space is split evenly between Administrative Offices and Shop. Form of contract was Design-Build with Scott assuming full responsibility for both Design and Construction.

Project Delivery Method:
Design | Build
Design Build Team: Crossroads Gas Co-op, Scott Builders

Cross Country Pipeline Office, Warehouse & Shop

Cross Country Pipeline Office, Warehouse & Shop

Spruce Grove, Alberta

PROJECT SUMMARY
End Use: Office/Warehouse
Size: 33,770 sq. ft.
Size: 11.5 acres

Project Delivery Method:
CCDC #14 Design | Build
Design Build Team: Cross Country Pipeline, Scott Builders, Laviolette Engineering Ltd.
Completed: February 2020

CSM Pumps Shop & Office

CSM Pumps Shop & Office

Nisku, Alberta

PROJECT SUMMARY
End Use:
Office/Manufacturing
Size: 
38,717 sq. ft.
Main Floor: 31,301 sq. ft.
Mezzanine: 2,841 sq. ft.
2nd Floor Office: 4,575 sq. ft.
Site: 0.8 acres

Project Delivery Method:
CCDC #14 Design | Build  Cost Plus
Design Build Team: CSM Pumps, Scott Builders, Mazurik Architecture
Completed: November 2019

Triple Random

Triple Random

Acheson, Alberta

PROJECT SUMMARY:
End Use: Oil & Gas
Size: 23,696 sq. ft.
Site: 9.66 acres

Project Delivery Method:
Design | Build
Consultant: Architect H Group Inc.
Completed: February, 2015

Ste. Anne Natural Gas

Ste. Anne Natural Gas

Lac Ste. Anne, Alberta

PROJECT SUMMARY:
Ste Anne Natural Gas Cooperative (SANG COOP LTD.) is the largest rural Gas distribution system in Alberta with service to over 6700 Members and maintaining over 4500 kilometres of gas pipeline. As in the case of Crossroads, SANG chose a Butler Engineered Building System with maintenance free roof and walls and providing an interior column free space for both the shop and administration areas of  17,400 square feet. SANG utilized Scott’s in-house Design Service. Building Delivery Method was Design-Build.

Project Delivery Method:
Design | Build
Design Build Team: Ste. Anne Natural Gas, Scott Builders, Walters Chambers & Associates

Viking

Viking

Lacombe, Alberta

PROJECT SUMMARY:
End Use: 
Oil & Gas
Size: 14,917 sq. ft.
Site: 7.09 acres

Project Delivery Method:
Design | Build
ConsultantCognidyn Engineering & Design
Completed: August, 2015

Schlumberger H2S Laboratory

Schlumberger H2S Laboratory

Calgary, Alberta

PROJECT SUMMARY:
End Use: 
Oil & Gas
Size: 11,672 sq. ft.

Project Delivery Method:
Design | Build
Consultant: Com-Tech Design as agent for Rick Balbi
Completed: November, 2016

Nova Chemicals

Nova Chemicals

Joffre, Alberta

PROJECT SUMMARY:
End Use: 
Oil & Gas
Size: 22,000 sq. ft.

Project Delivery Method:
Construction Management
Architect: Technip USA
Completed: October, 2015
Scott Builders supplied and installed 6 custom Pre-Eng buildings on the R3 plant expansion. 
Scott Builders was able to immerse themselves into the Responsible Care environment utilizing our own safety and loss prevention systems and adapt to NOVA’s expectations.

Haulin Acid

Haulin Acid

Calgary, Alberta

PROJECT SUMMARY:
End Use: 
Oil & Gas
Size: 22,407 sq. ft.
Site: 2.5 acres

Project Delivery Method:
Design | Build
ConsultantSveinson Consulting
Completed: June, 2015

Fluid Life

Fluid Life

Edmonton, Alberta

PROJECT SUMMARY:
End Use: 
Oil & Gas
Size: 46,725 sq. ft.
Site: 2.99 acres

Project Delivery Method:
Design | Build
Consultant: Hodgson Schilf Architects
Completed: November, 2016
This facility includes a 9,900 sq. ft. main floor laboratory.

Get in touch

Drop us a line and we will return your message as soon as possible

You are currently on the Fluid Life profile page