Provost Medical Clinic

Provost Medical Clinic

Provost, Alberta

PROJECT SUMMARY
End Use: Medical Clinic
Size: 16,318 sq. ft.
Site: 1 acres

Project Delivery Method:
CCDC #14 Design | Build
Design Build Team: Provost Medical Clinic, Scott Builders, BCW Architects
Completed: April 2021
Notes:
Construction of a new 2 storey facility.
Installation of a precast basement and structural steel 2 storey shell.
The basement consists of future lease space, meeting areas as well as washroom facilities.
The main floor is developed as a full serve doctors office with staff offices, exam rooms, lunchroom and washroom facilities.
The second floor is divided into Primary care network space as well as a fully functioning dental clinic.

Crosspointe Freezer Building

Crosspointe Freezer Building

Balzac, Alberta

PROJECT SUMMARY
End Use: Office/Warehouse
Size: 65,000 sq. ft.
Site: 3 acres

Project Delivery Method:
CCDC #2 Stipulated Price Contract
Consultant: T.I. Studios Architecture Inc.
Completed: March 2021
Notes:
This facility includes a sub-zero (-200C) freezer and loading bay with 11 loading docks.
Structurally, this facility has a piles and grade beam foundation, insulated slab-on-grade with hydronic heating subbase, steel structure with insulated metal panels on the exterior walls.

Trail Appliances Crowfoot

Trail Appliances Crowfoot

Calgary, Alberta

PROJECT SUMMARY
End Use: Renovation
Size: 27,200 sq. ft.

Project Delivery Method:
Design | Build  Cost Plus
Consultant: The Tarjan Group
Completed: September, 2019
Notes: A full interior and exterior renovation, this project required a full interior demolition as well to facilitate a structural modification. New glass, spandrel panel and alucabond panels were added to the exterior while the interior’s full reno created an open concept to showcase products. All sidewalks, curbing and the parking lot were also redone.

Buy Low Grocery Store

Buy Low Grocery Store

Blackfalds, Alberta

PROJECT SUMMARY
End Use: Grocery Store
Size: 35,393 sq. ft.
Site: 6.4 acres

Project Delivery Method:
Design | Build
Consultant: BCW Architects
Completed: December, 2019
Notes: This is one of three projects Scott Builders is working on with Buy-Low.

Cross Country Pipeline Office, Warehouse & Shop

Cross Country Pipeline Office, Warehouse & Shop

Spruce Grove, Alberta

PROJECT SUMMARY
End Use: Office/Warehouse
Size: 33,770 sq. ft.
Size: 11.5 acres

Project Delivery Method:
CCDC #14 Design | Build
Design Build Team: Cross Country Pipeline, Scott Builders, Laviolette Engineering Ltd.
Completed: February 2020

CSM Pumps Shop & Office

CSM Pumps Shop & Office

Nisku, Alberta

PROJECT SUMMARY
End Use:
Office/Manufacturing
Size: 
38,717 sq. ft.
Main Floor: 31,301 sq. ft.
Mezzanine: 2,841 sq. ft.
2nd Floor Office: 4,575 sq. ft.
Site: 0.8 acres

Project Delivery Method:
CCDC #14 Design | Build  Cost Plus
Design Build Team: CSM Pumps, Scott Builders, Mazurik Architecture
Completed: November 2019

Royal Vista Plaza

Royal Vista Plaza

Calgary, Alberta

PROJECT SUMMARY:
End Use:  Retail
Size: 42,431 sq. ft.
Site: 1.18 acres

Project Delivery Method:
Stipulated Price
Consultant: FAAS Architecture
Completed:
February, 2020

Southbank Medical Centre

Southbank Medical Centre

Rockyview County, Alberta

PROJECT SUMMARY:
End Use: Office
Size: 16,806 sq. ft.
Site: 1.06 acres

Project Delivery Method:
Fixed Price
Consultant: Sonroc
Completed: June, 2017

Flagstaff County

Flagstaff County

Sedgwick, Alberta

PROJECT SUMMARY
End Use: Municipal
Size: 38,000 sq. ft.
Site: 15 acres

Project Delivery Method:
Design | Build
Consultant: Turpin Kong Architects Inc.
Completed: December, 2018

Running Creek Medical Centre

Running Creek Medical Centre

Edmonton, Alberta

PROJECT SUMMARY:
End Use: Office
Size: 35,325 sq. ft.

Project Delivery Method:
Construction Management
Consultant: EFG Architect
Completed: September, 2016

Get in touch

Drop us a line and we will return your message as soon as possible

You are currently on the Running Creek Medical Centre profile page