Trail Appliances Crowfoot

Trail Appliances Crowfoot

Calgary, Alberta

PROJECT SUMMARY
End Use: Renovation
Size: 27,200 sq. ft.

Project Delivery Method:
Design | Build  Cost Plus
Consultant: The Tarjan Group
Completed: September, 2019
Notes: A full interior and exterior renovation, this project required a full interior demolition as well to facilitate a structural modification. New glass, spandrel panel and alucabond panels were added to the exterior while the interior’s full reno created an open concept to showcase products. All sidewalks, curbing and the parking lot were also redone.

Buy Low Grocery Store

Buy Low Grocery Store

Blackfalds, Alberta

PROJECT SUMMARY
End Use: Grocery Store
Size: 35,393 sq. ft.
Site: 6.4 acres

Project Delivery Method:
Design | Build
Consultant: BCW Architects
Completed: December, 2019
Notes: This is one of three projects Scott Builders is working on with Buy-Low.

Cross Country Pipeline

Cross Country Pipeline

Spruce Grove, Alberta

PROJECT SUMMARY
End Use: Office/Warehouse
Size: 33,770 sq. ft.
Size: 11.5 acres

Project Delivery Method:
Design | Build
Design Build Team: Cross Country Pipeline, Scott Builders, Laviolette Engineering Ltd.

CSM Pumps

CSM Pumps

Nisku, Alberta

PROJECT SUMMARY
CSM specialize in the supply, support, repair and service of surface, pump unitization and turnkey pump packages for industry including the Utilities sector. The shop, at 26,460 sq. ft., is built utilizing a 140’ x 145’ Butler Building, adjoining two 70’ clear span modules each accommodating a 20 ton crane. Overhead doors are 30’ wide. The 2 story office portion is 10,260 sq. ft.

Project Delivery Method:
Design | Build  Cost Plus
Design Build Team: CSM Pumps, Scott Builders, Mazurik Architecture

Royal Vista Plaza

Royal Vista Plaza

Calgary, Alberta

PROJECT SUMMARY:
End Use:  Retail
Size: 42,431 sq. ft.
Site: 1.18 acres

Project Delivery Method:
Stipulated Price
Consultant: FAAS Architecture
Completed:
February, 2020

Southbank Medical Centre

Southbank Medical Centre

Rockyview County, Alberta

PROJECT SUMMARY:
End Use: Office
Size: 16,806 sq. ft.
Site: 1.06 acres

Project Delivery Method:
Fixed Price
Consultant: Sonroc
Completed: June, 2017

Flagstaff County

Flagstaff County

Sedgwick, Alberta

PROJECT SUMMARY
End Use: Municipal
Size: 38,000 sq. ft.
Site: 15 acres

Project Delivery Method:
Design | Build
Consultant: Turpin Kong Architects Inc.
Completed: December, 2018

Running Creek Medical Centre

Running Creek Medical Centre

Edmonton, Alberta

PROJECT SUMMARY:
End Use: Office
Size: 35,325 sq. ft.

Project Delivery Method:
Construction Management
Consultant: EFG Architect
Completed: September, 2016

Perras Lands

Perras Lands

Fort McMurray, Alberta

PROJECT SUMMARY:
End Use: Office
Size: 75,803 sq. ft.

Project Delivery Method:
Design | Build
Consultant: William Ross Architect
Completed: September, 2015
This project consisted of four buildings constructed simultaneously.

Millenium Ridge

Millenium Ridge

Sherwood Park, Alberta

PROJECT SUMMARY:
End Use: Office
Size: 62,172 sq. ft.
Site: 2.9 acres

Project Delivery Method:
Construction Management
Consultant: Sanford Designs
Completed: July, 2015