Stihl
Acheson, Alberta
PROJECT SUMMARY
End Use: Manufacturing
Size: 64,770 sq. ft.
Site: 7.6 acres
Project Delivery Method:
Design | Build
Consultant: Laviolette Engineering Ltd.
Completed: November, 2019
Acheson, Alberta
PROJECT SUMMARY
End Use: Manufacturing
Size: 64,770 sq. ft.
Site: 7.6 acres
Project Delivery Method:
Design | Build
Consultant: Laviolette Engineering Ltd.
Completed: November, 2019
Calgary, Alberta
Project Summary:
Scott recently completed their 4th Glover facility, pictured above. It is the 2nd facility built for Glover in Calgary. The attractive 27,500 sq. ft. truck dealership is comprised of 17,500 sq. ft. of maintenance shop including a wash bay and welding area. The balance of space is primarily dedicated to a parts warehouse along with administration offices.
The shop area utilized a very efficient insulated metal sandwich panel while precast and insulated stucco finish panels were used around the parts and administration areas.
Project Delivery Method:
Design | Build
Design Build Team: Glover, Scott Builders,
BCW Architects
Sparwood, British Columbia
PROJECT SUMMARY
End Use: Manufacturing
Size: 24,413 sq. ft.
Site: 5 acres
Project Delivery Method:
Design Bid Build
Consultant: BCW Architects
Completed: November, 2019
PROJECT SUMMARY
End Use: Manufacturing
Size: 67,400 sq. ft.
Site: 8.28 acres
Project Delivery Method:
Design | Build
Consultant: Rick Balbi Architect Ltd.
Completed: July, 2015
Includes an engineered, lined storage and water holding pond, approximately 1 acre.
PROJECT SUMMARY
End Use: Manufacturing
Size: 42,450 sq. ft.
Site: 7.17 acres
Project Delivery Method:
Design | Build
Consultant: Laviolette Engineering Ltd.
Completed: October, 2015
PROJECT SUMMARY
End Use: Manufacturing
Size: 30,000 sq. ft.
Site: 8.3 acres
Project Delivery Method:
Stipulated Price
Consultant: T.i. Studios Architecture Inc.
Completed: February, 2017
Relevance to Professional Excavators building:
Limited services building designation (water, sanitary, storm holding tanks and collection areas).
Use of conventional steel structure and precast walls.
Large OH cranes.
Heavy machinery shop area with a wash bay.
Assisted the client with extensive cost savings and value engineering exercises.
PROJECT SUMMARY
End Use: Manufacturing
Size: 74,270 sq. ft.
Site: 12 acres
Project Delivery Method:
Design | Build
Consultant: BCW Architects
Completed: December, 2019
Fire protection was provided by a 2.0 acre retention pond and pump house.
All site services had to be accommodated onsite via underground cisterns.
The High Voltage Equipment Servicing Bay housed two 80 ton overhead cranes that run from inside to outside.
PROJECT SUMMARY
End Use: First Nations
Size: 31,135 sq. ft.
Project Delivery Method:
Design | Build
Consultant: Planworks Architecture Inc.
Completed: October, 2016
Rich Valley, Alberta
PROJECT SUMMARY
End Use: Cannabis Grow Facility
Size: 37,260 sq. ft.
Site: 2 acres
Project Delivery Method:
Design | Build
Consultant: Laviolette Engineering Ltd.
Completion Date: October 2018
Drop us a line and we will return your message as soon as possible
You are currently on the Atlas Growers profile page