High River Fire Hall Addition
High River, Alberta
PROJECT SUMMARY
End Use: Fire Hall
Size: 8,411 sq. ft. Addition
Project Delivery Method:
Fixed Price Contract
Consultant: S2 Architecture
Completed: August 2021
High River, Alberta
PROJECT SUMMARY
End Use: Fire Hall
Size: 8,411 sq. ft. Addition
Project Delivery Method:
Fixed Price Contract
Consultant: S2 Architecture
Completed: August 2021
New Sarepta, Alberta
PROJECT SUMMARY
End Use: Fire Hall
Size: 16,330 sq. ft.
Project Delivery Method:
Design | Build
Consultant: Stantec
Completed: May 2021
PROJECT SUMMARY
End Use: First Nations
Size: 12,163 sq. ft.
Site: 2.04 acres
Project Delivery Method:
Lump Sum
Completed: August, 2018
Unique Features: Special Alerting systems, security, CO2 management system.
Prefinished composite metal panels, masonry veneer and glazing.
Challenges included utility right of ways along three sides, overhead power line, and grading requirement of 1m above flood plain elevation due to South Saskatchewan River.
Retaining wall was also required due to grading difference.
PROJECT SUMMARY
End Use: First Nations
Size: 6,459 sq. ft.
Site: 0.2 acres
Project Delivery Method:
Construction Management
Architect: Turpin Kong Architect Ltd.
Engineer: Arrow
Completed: October, 2018
48′ tall precast concrete hose tower with internal stairs/catwalk system and electric hoist.
Post disaster construction with structural slab and emergency generator.
Office & Storage facility with PEMB and conventional steel structure.
PROJECT SUMMARY
End Use: Fire Hall
Size: 15,651 sq. ft.
Site: 2.7 acres
Project Delivery Method:
Design | Build
Consultant: Group 2
Engineer: Arrow
Completed: August, 2018
Five bays with 786 sq. ft. mezzanine.
Future drive thru bay capability.
Structural precast concrete, non combustible construction with 92′ clear span.
100′ radio tower.
Hose drying hoist with elevated drying racks.
Living quarters complete with sauna.
Breathing Apparatus Compressor coordination.
An abandoned farm house was discovered buried on site.
Eight month construction schedule.
PROJECT SUMMARY
End Use: Fire Hall
Size: 7,668 sq. ft.
Site: 2.41 acres
Project Delivery Method:
Design | Build
Consultant: Turpin Kong Architects Inc.
Completed: 2016
7 month construction schedule.
Structural slab/disaster resistant construction.
38′ high precast concrete hose tower complete with steel catwalk system and electric hoist Pre-engineered steel structure complete with R-20 walls and R-40 membrane roof.
This is the first of two fire halls SBI designed and built for Saddle Hills County.
PROJECT SUMMARY
End Use: Fire Hall
Size: 11,529 sq. ft.
Site: 0.4 acres
Project Delivery Method:
Hard Bid
Consultant: Gibbs Gage Architect
Completed: 2016
Drop us a line and we will return your message as soon as possible
You are currently on the Airdrie Fire Hall profile page