Savanna Fire Hall

Saddle Hills County, Alberta

PROJECT SUMMARY
End Use: First Nations
Size: 6,459 sq. ft.
Site: 0.2 acres

Project Delivery Method:
Construction Management
Architect: Turpin Kong Architect Ltd.
Engineer: Arrow
Completed: October, 2018
48′ tall precast concrete hose tower with internal stairs/catwalk system and electric hoist.
Post disaster construction with structural slab and emergency generator.
Office & Storage facility with PEMB and conventional steel structure.

Get in touch

Drop us a line and we will return your message as soon as possible

You are currently on the Savanna Fire Hall profile page