About the project

This spectacular LEED® Gold recreation facility includes an NHL-sized arena that converts into Olympic size, a spectator gymnasium, fitness centre, squash courts and Kinesiology Department. The project underwent extensive sitework as well with the excavation of an 8.41m deep storm pond. The building is constructed of conventional steel and features a tall glass architectural showpiece. It was built in time for the 2019 Canada Games and today is used extensively by RDC students and the general public.

Location:

Red Deer, Alberta

Size:

200,000 sq. ft.

Building Delivery Method:

Design-Build

Design Team

Red Deer College, Scott Builders Inc., Clark, Stantec and HCMA