PROJECT SUMMARY
End Use: First Nations
Size: 12,163 sq. ft.
Site: 2.04 acres
Project Delivery Method:
Lump Sum
Completed: August, 2018
Unique Features: Special Alerting systems, security, CO2 management system.
Prefinished composite metal panels, masonry veneer and glazing.
Challenges included utility right of ways along three sides, overhead power line, and grading requirement of 1m above flood plain elevation due to South Saskatchewan River.
Retaining wall was also required due to grading difference.