Executive Summary
EQUS, Canada’s largest member-owned utility company, faced significant challenges in relocating its service truck operations to a larger, more modern facility. With a steeply graded site, a strict budget, and high-end design requirements, EQUS needed a reliable partner to deliver results. Scott Builders stepped in, providing customized solutions through pre-construction planning, innovative design iterations, and efficient execution. The result? A 19,963 sq. ft. state-of-the-art facility completed under budget and ahead of expectations, fostering a successful partnership built on trust and expertise.
Introduction
EQUS operates as a leader in utilities, servicing rural areas across Alberta with safe and efficient energy solutions. Growth demanded a new facility to house their service vehicles and offices, offering better functionality and accessibility while reflecting their corporate identity. However, the project presented numerous complexities, including site challenges, a tight budget, and a need for high-end finishes. EQUS turned to Scott Builders to make their vision a reality.
The Challenges
The Scott Builders team faced multiple hurdles during this project:
- Outdated Facility: Their outdated, undersized building in Innisfail could no longer accommodate their growing operational needs.
- Challenging Site: The new site had a steep 4-meter grade difference, presenting design and construction challenges that could escalate costs.
- High-End Finishes: EQUS wanted their new facility to align with their corporate office’s aesthetics while adhering to a strict $5.7M budget.
- Mid-Project Solar Panel Addition: Incorporating solar panels into the design added structural complexities and cost concerns mid-project.
- Winter Construction Timeline: Shifting the project to winter raised concerns about high heating costs.
- Past Experience: A previous negative construction experience made EQUS cautious, requiring a trustworthy and transparent approach.
The Solution
Scott Builders leveraged their expertise, foresight, and collaborative approach to address EQUS’s unique challenges:
-
Extensive Pre-Construction Planning:
Scott Builders conducted detailed evaluations to optimize both the site design and the build. By employing a carefully balanced cut-and-fill method, the team managed the steep grade without requiring costly imports of fill materials.
-
Design Iterations to Match Aesthetics and Budget:
Achieving EQUS’s desired aesthetic required nine separate design revisions. Scott Builders sourced creative, cost-effective alternatives—such as split-face brick—to reflect the premium look of their corporate office while maintaining budget discipline.
-
Adaptable Solar Panel Integration:
EQUS decided to add solar panels midway through the project. Scott Builders seamlessly adapted the structural design to incorporate this change while maintaining the established budget and timeline.
-
Efficient Winter Scheduling:
Strategic planning ensured the building envelope was completed before peak winter, minimizing exposure to fluctuating temperatures. Natural gas heating was used instead of propane, reducing operational heating costs considerably.
-
Transparent Communication:
Monthly project updates, a clear change order process, and collaborative dialogue established trust and clarity, keeping EQUS informed every step of the way.
Through this tailored approach, Scott Builders ensured all EQUS’s needs were met while upholding exceptional quality.
Results
The partnership between EQUS and Scott Builders delivered outstanding results:
- Completed Facility:
- 19,963 sq. ft. total area, including: 8,804 sq. ft. office space, 2,817 sq. ft. warehouse space, and 7,700 sq. ft. shop bays.
- A new location which provides better highway access and improved operational efficiency.
- Aesthetic and Budget Goals Achieved:
- The facility matched EQUS’s corporate branding with high-end finishes and carefully curated materials.
- Delivered under the $5.7M budget through strategic cost-saving solutions, such as creative design alternatives.
- Energy Efficiency Gains:
- Heating costs during winter construction were significantly reduced, with only 43% of the original heating allowance used.
- Solar panels were successfully integrated to improve energy efficiency while maintaining budget constraints.
- Client Satisfaction:
- EQUS expressed their satisfaction with the collaborative design process, efficient execution, and overall quality.
- Trust was established with Scott Builders, overcoming previous negative experiences with other contractors.
Conclusion
Scott Builders’ dedication to precision, collaboration, and trust enabled EQUS to overcome significant challenges and achieve their goals. By employing innovative solutions, transparent communication, and thorough execution, this partnership resulted in a first-class facility that positions EQUS for future growth.
Looking ahead, the successful integration of solar panels and improved logistical setup places EQUS in an excellent position to support its expanding operations while promoting sustainability—a key step for their future vision.
For organizations seeking reliable construction solutions tailored to their unique challenges, Scott Builders provides unparalleled expertise and results.
Discover how Scott Builders can transform your project with expert solutions—book a consultation today.