PROJECT SUMMARY
End Use: Fire Hall
Size: 15,651 sq. ft.
Site: 2.7 acres
Project Delivery Method:
Design | Build
Consultant: Group 2
Engineer: Arrow
Completed: August, 2018
Five bays with 786 sq. ft. mezzanine.
Future drive thru bay capability.
Structural precast concrete, non combustible construction with 92′ clear span.
100′ radio tower.
Hose drying hoist with elevated drying racks.
Living quarters complete with sauna.
Breathing Apparatus Compressor coordination.
An abandoned farm house was discovered buried on site.
Eight month construction schedule.
Drop us a line and we will return your message as soon as possible
You are currently on the Calmar Fire Hall profile page